Great design means nothing without great execution. At LC Interiors, project management is woven into every stage of our process – from the earliest concept sketches through to the final walkthrough. We coordinate contractors, manage timelines, control budgets, and resolve challenges before they become problems.
As both designer and project manager, Lana maintains direct oversight of every site. This dual role ensures that design intent is preserved through construction – no detail is lost in translation between drawing board and build.
Our project management approach includes weekly site inspections, contractor coordination meetings, progress documentation, and quality control checkpoints at every critical milestone.
Contractor selection and appointment, construction scheduling and timeline management, budget tracking and cost control, site supervision and quality inspections, material delivery coordination, snag lists and final handover.
For villa renovations and apartment refurbishments, project management is especially critical. We coordinate demolition, structural modifications, MEP works, finishing trades, and furniture installation into a seamless sequence that minimises disruption and maximises value.
Clients receive regular progress updates with photographs, timeline tracking, and budget summaries. Our open communication approach means you always know exactly where your project stands.
In practice, this means a written progress update every week, not just a phone call. Each update includes dated photographs of work completed since the last report, an updated construction schedule showing which trades are on site and what is coming next, and a live budget-versus-actual summary so you can see exactly how spend compares to the original quote at any point in the project. If a contractor flags a variation, a material substitution, or an unexpected condition on site – a damaged slab, a hidden pipe run, a supplier delay – we document it immediately with photos and cost implications and escalate it to you as a decision point rather than making the call ourselves. Nothing gets approved or paid for on your behalf without your sign-off first.
Before any project is considered complete, we run a formal snagging process. As the works near completion, Lana walks the site jointly with the contractor, room by room, and compiles a documented snag list – every defect, unfinished detail, or below-standard finish is logged with a photograph and a location reference. This list is shared with the contractor in writing along with an agreed remediation window, typically a set number of working days depending on the scope of items outstanding.
Once the contractor confirms the list has been actioned, we carry out a re-inspection against the same list, item by item. Only when every item has been verified as resolved do we sign off on the snag list. Final handover – including keys, warranties, as-built documentation, and appliance manuals – only takes place after this sign-off, so nothing is accepted as “finished” until it actually is.
To protect our clients financially through this process, we structure contractor payment schedules with a retention held back until snagging is complete. As standard practice, 10% of the contract value is withheld from the contractor’s final payment until the snag list has been fully cleared and signed off. This is the same retention benchmark we recommend across all our renovation projects, and reputable contractors in Dubai are used to working this way.
The retention gives the client real leverage: a contractor is never paid out in full while outstanding defects remain, which removes the financial incentive to rush off site before the work is genuinely finished. It is a simple mechanism, but it is one of the most effective protections in any renovation or fit-out contract, and we build it into every project we manage.